green-building

Scope Of Work

Project Management, Construction Management, Cost Control, Scheduling, Constructability, and CM Team Training.

Project Description

Ironcladresources has been contracted to construct the next stages of tailings storage facility embankment raising at a large mining operation in South Gobi region. The scope of work includes mine infrastructure relocation (roadways, pipelines, collection ponds); topsoil and subsoil stripping and relocation; sorting and processing of embankment fill; processing, loading, hauling, and placing of embankment fill; processing and crushing aggregates; MSE wall construction; and final TSF reclamation. Ironcladresources will also put up 92,500 SY of geotextile and 116,500 SY of 60, 80, and 100 mil liners.

To increase the total capacity of the tailings storage facility, Nevada Centerline Raise project is a brownfield expansion of the tailings facility and tailings systems involving the building of lined tailings dams, reclaim ponds, access roads, tailings pumping systems, tailings discharge and water reclaim systems.